Sunday, November 16, 2014

Renovation and More



We started a guest bathroom remodel on September 22nd and it was finished by the end of that week. The bathroom needed updating and the plumbing for the double vanity sinks needed to be put into the wall instead of the configuration that went through the cabinet when we added a sink to the original plan a few years ago. Before photos. 



The only thing that remained from the original bathroom was the tub, it was still fine. So the new plan added new larger tile in the shower and on the floor which had been vinyl. A new upgraded cabinet and quartz counter top was installed. A new shower head was also installed and a new shower rod. We had them take out an old medicine cabinet in the wall and repair the hole in the wall. Steve and I did the final work of priming and painting the ceiling and walls and adding in two new mirrors over the sink to replace the one large mirror. A new toilet and a new lighting fixture plus new towels and rugs completed the remodel. It was all great. After photos.




However somehow a leak had developed in the hot water source to the new plumbing and we came home from church a couple days after the workers left to find a giant bubble in our kitchen ceiling. We had three containers collecting the dripping water until the plumber found the source. Anyway the entire kitchen ceiling had to be replaced and that was a huge mess and took another couple weeks. We again did the final priming and painting ourselves.
Photos of the kitchen.





We are glad to have it all done and that the contractor paid for the damage repair. Now we are in the process of doing a deep cleaning of the whole house to get up the fine dust that got all over despite all the plastic sheeting and floor coverings.